Our Projects

Project List

Other Details

Consultancy Services for Feasibility study for 2-laning with Paved Shoulders of various state highway roads (Total Length 401.30 Km) in the state of Rajasthan through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis (Package12).

Location: Rajasthan
Length: 360.810 Km
Project Cost: INR 800 Cr
Funded By: PPP

Consultancy Services for Feasibility study for 2-laning with Paved Shoulders of various state highway roads (Total Length 146 Km) in the state of Rajasthan through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis (Package EWCS).

Location: Rajasthan
Length: 128.705 Km
Project Cost: INR 320 Cr
Funded By: PPP

Consultancy Services for Feasibility study for 2-laning with Paved Shoulders of various state highway roads (Total Length 420 Km) in the state of Rajasthan through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis (Package21)

Location: Rajasthan
Length: 393.660 Km
Project Cost: INR 850 Cr
Funded By: PPP

Consultancy Services for Feasibility study for 2laning with Paved Shoulders of various state highway roads (Total Length 205 Km) in the state of Rajasthan through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis (Package13)

Location: Rajasthan
Length: 207.530 Km
Project Cost: INR 410 Cr
Funded By: PPP

Consultancy Services for Feasibility study for twolaning of various state highway roads (Total Length 528 Km) in the state of Rajasthan through Public Private Partnership (the PPP) on Design, Build, Finance, Operate and Transfer (the DBFOT) basis (Package 5)

Location: Rajasthan
Length: 531 Km
Project Cost: INR 1100 Cr
Funded By: PPP

Preparation of Detailed Project Report for Construction of Sawai-Madhopur Bypass in the state of Rajasthan.

Length: 25 Km
Project Cost: INR 110 Crore

Survey and investigation of Swaroopganj-Kotra-Kherwara (150kms, Approx length) Section of NH -927A in the State of Rajasthan

Location: Rajasthan

Survey and investigation of Upli-Odhan to Bhatewar NH-162, near about 55km.

Location: Rajasthan

Pre-bid Studies for rehabilitation and augmentation of the Widening & Strengthening to Two-Lane with paved shoulder of Phalodi – Jaisalmer Section of NH 15 from km 163.400 to km 323.857 in the state of Rajasthan under NHDP Phase – I

Location: Rajasthan

Pre Bid Studies for 6/8 laning of Port road connectivity Project JNPT Phase-II (Package-3)- Construction of NH-348 (old SH-54) from km 7.422 to km 13.160 and AmraMarg from km 0.000 to km 5.360 the state of Maharashtra

Location: Maharashtra

Pre Bid Studies for 6/8 laning of JNPT phase II (Package 2) Project- Construction of Gavan Phata Interchange (from km.14.740 to km.15.894 of NH-4B, from km.13.160 to km.14.880 of NH-348 old SH-54) and from km.5.360 to km.6.785 of Amra Marg) and NH-4B (from km.6.073 to km.14.740 and from km.15.894 to km.21.200) in the state of Maharashtra

Location: Maharashtra

Pre Bid Studies for 6/8 laning of JNPT phase II (Package 2) Project- Construction of Gavan Phata Interchange (from km.14.740 to km.15.894 of NH-4B, from km.13.160 to km.14.880 of NH-348 old SH-54) and from km.5.360 to km.6.785 of Amra Marg) and NH-4B (from km.6.073 to km.14.740 and from km.15.894 to km.21.200) in the state of Maharashtra

Location: Maharashtra

Pre Bid Studies for 6/8 laning of Port road connectivity Project JNPT Phase-II (Package-4)- Construction of NH-4B from km 21.200 to km 27.270(D to E section) and from km 0.000 to km 4.492(D to G section) in the state of Maharashtra

Location: Maharashtra

Pre Bid Studies for our laning of Jhanjhi to Demow section from Km 491.050 to Km 535.250 and Demow to Bigibeel Junction near Lapetketa section from km 535.250 to km 581.700 of NH-37 in the State of Assam under SARDP

Location: Assam

Pre Bid Studies for Rehabilitation and upgradation to two lane with earthen Shoulder of Nongstion-Domiasiat-Mawthabah road section (Design chainage km 0.00 to Km 61.574) in the State of Meghalaya

Location: Meghalaya

Pre Bid Studies for Re alignment and improvement to 2-lane with paved shoulders of NH-38 By passing Digboi, Powai, Margherita and Ledo towns in between km20.00 to km52.00 in Assam. under SARDP

Location: Assam

Pre Bid Studies for 4 Laning of (i) Numaligarh to Jorhat section from Km 402.50 to Km 453.00 except Dergaon Bypass and (ii) Jorhat to Jhanji Section from Km 453.000 to Km 491.050 of NH-37 in the state of Assam

Location: Assam

Pre-Bid Studies for 4-laning with paved shoulder for Varanasi-Gorakhpur section of NH-29 on DBFOT basis.

Location: Uttar-Pradesh

Pre – Bid Services for Four Lane Stand Alone Ring Road / Bypass for The Nagpur City, Package-I from Km 0+500 To Km 34+000 (Design Length – 33+500 Km) In The State Of Maharashtra on Hybrid Annuity Mode.

Location:Maharashtra

Pre – Bid Services for Four Lane Stand Alone Ring Road/Bypasses for Nagpur City, Package-II from km 34+000 to km 62+035. (Total Length - 28+035 km) in the state of Maharashtra on BOT (Hybrid Annuity) Mode.

Location:Maharashtra

Pre – Bid Services for Four laning of Bhavnagar –Talaja section of NH-8E from Km 7.090 (design chainage km 6.945) to Km 53.585 (design chainage Km 54.990) on Hybrid (Annuity) mode in the State of Gujarat

Location:Gujarat

Pre – Bid Services for Four laning of Talaja – Mahuva section of NH-8E from Km 53.585 (design chainage km 54.990) to Km 100.100 (design chainage Km 100.450) on Hybrid (Annuity) mode in the State of Gujarat

Location:Gujarat

Pre – Bid Services for Four Laning of Mahuva to Kagavadar section of NH-8E from Km 100.100 (design chainage Km 100.450) to Km 139.915 (design chainage km 140.470 )In the State of Gu}arat through public private partnership (PPP) on Hybrid (Annuity)mode in the State of Gujarat

Location:Gujarat

Pre – Bid Services for Rehabilitation and up-gradation of NH-66 from 241 km to 281 km (Arawali-Kante section) to four lane with paved shoulder under NHDP-IV on Hybrid Annuity Mode.

Location:Maharashtra

Pre – Bid Services for Rehabilitation and up-gradation of NH 66 (Old NH 17) from 281.300 km to 332.200 km Kante-Wakad section to four lanes in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode.

Location:Maharashtra

Preparation of Detail Project Report for Natanika Bada Kathumar I/C By Pass Road (SH-44) from 0+000 km at Natani ka Bada to 60+095 km (T- Junction of SH 13 to kathumar at Cross junction with SH-22) in the State of Rajasthan under Swiss challenge mode.

Location:Rajasthan

Preparation of Detail Project Report for Mahuwa Gadi Govindgarh Two lane with Paved Shoulder of 0+000 Km to 24+500 Km from Mahuwa to Gadi section and Two-Laning of Km 24.5 to Km 65.0 from Gadi to Govindgarh (via Lakshmangarh) section of SH-35 in the State of Rajasthan under Swiss challenge mode.

Location:Rajasthan

Preparation of Detail Project Report for Ajarka - Tala I/C By Pass Two-laning of 0+000 Km to 132+000 Km of SH-52 section comprising the Ajarka - Tala (Highway-II) (Pkg-16) in the State of Rajasthan under Swiss challenge mode.

Location:Rajasthan

Six Laning of Km 401.200 to 494.410 of NH-8 in the States of Gujarat (Length 93.210 Km) under NHDP Phase V (Package-VI) on Hybrid Annuity Mode.

Location:Gujarat